Drain Piping Work - Toshiba RAV-SM562XT-E Installation Manual

Hide thumbs Also See for RAV-SM562XT-E:
Table of Contents

Advertisement

5

DRAIN PIPING WORK

Drainage
1. Run the Drain hose sloping downward.
NOTE :
• The hole should be made at a slight downward slant on the outdoor side.
Under Ceiling Installation
In case of upward drainage from the unit, (Under Ceiling Installation), it is necessary to use the Drain pump kit
of separately sold optional part.
1. Do not raise the Drain hose.
2. Do not put the Drain hose into water.
3. Do not form the Drain hose into a wave shape.
4. Do not put the Drain hose end in the drainage ditch.
2. Open the louver manually and put some water into it.
Then check the flow of water from the Drain hose.
3. When connecting the Extension drain hose; insulate the connecting part of Extension drain hose with the Pipe
shield.
Arrange the drain pipe for proper drainage from the unit.
Improper drainage can result in dew-dropping. (Provide by customer)
50 mm or more
NOTICE
CAUTION
Pipe shield
Inside the room
Drain hose
CAUTION
10
Console Installation
50 mm or more
Extension drain hose

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rav-sm802xt-eRav-sm562at-eRav-sm802at-e

Table of Contents