www.schaerer.com
CauTIOn!
Machine at risk!
„Ready for operation" window
with „2nd level" option
„Ready for operation" window
without „2nd level" option
18
►
Insert the milk hose into the milk.
The milk hose end must be in contact with the bottom of the container!
;
Option 2: Cup & Cool/MyFridge
Danger of contamination! Always clean the container thoroughly before filling!
►
Open the cooler door.
►
Remove the milk container and rinse it.
►
Fill fresh, pre-cooled milk (3 – 5°C) into the container.
►
Place the milk container back into the cooler and close the cooler door.
Switching on
►
Press the
button for 5 seconds.
The coffee machine switches on and heats up.
;
The „Ready for operation" main window appears as soon as the coffee machine is ready to dis-
;
pense a beverage.
The beverage buttons are lit
;
„ready for operation" main window
Warm rinse field
To deactivate this function, see „Operating options".
During warm rinsing, the coffee machine pipework is rinsed with warm water. The water warms up the
brewing system after lengthy brewing pauses and ensures that the brewed coffee is at an optimum tem-
perature.
►
Touch the
field.
Warm rinsing begins.
;
This is recommended after a brewing pause of more than 30 minutes, especially before dispensing a cup
of espresso.
Hidden „Menu" and „Information" fields
►
On the „Ready for operation" display, touch the area with no fields.
►
The „Information" and „Menu" fields become visible.
Symbol
Description
Information menu
See "'Information' menu" in this chapter.
Selection menu (menu)
See "Programming".
.
Operation
BASCV - EN
Version 02
12.2009
Need help?
Do you have a question about the Coffee Vito and is the answer not in the manual?