Unpacking/Installation - KERN GAB-N Operating Instructions Manual

Bench scales
Hide thumbs Also See for GAB-N:
Table of Contents

Advertisement

5.2 Unpacking/installation

Carefully remove the balance from the packaging, remove plastic cover and setup
balance at the intended workstation.
Ensure that transport guard has been removed
(only existing in 6 kg models)
1
To loosen the transport guard screw out transport screw [1] anticlockwise.
For transportation screw down the transport screw till to the stop in clockwise
direction.
10
GAB-N-BA-e-1315

Advertisement

Table of Contents
loading

Table of Contents