Installation: Primary/Secondary Connections
Primary
Caution
cable in the same conduit as the power supply (120-220V) cable.
Primary
Operator
The control board provides a connector for Primary/Secondary connectivity. This
connector will allow synchronized operation with a second gate operator.
BLSL3060
Outside
Interconnecting Conduit
Inside
– Do not run Primary/Secondary communication
Shielded Cable
Shield Wire
Silver
Red
Green
Blk\Wht
TECHNICAL SUPPORT: (909) 259-6001
Opens First
Conduit
NOTE: Use 18
Guage Wire for
runs up to 100'
Secondary
Red
Green
Blk\Wht