Installing The Server Into The Rack - Supero SUPER SERVER 5013C-MT User Manual

Hide thumbs Also See for SUPER SERVER 5013C-MT:
Table of Contents

Advertisement

Chapter 2: Server Installation

Installing the Server into the Rack

You should now have rails attached to both the chassis and the rack
unit.
The next step is to install the server into the rack.
Do this by
lining up the rear of the chassis rails with the front of the rack rails.
Slide the chassis rails into the rack rails, keeping the pressure even on
both sides (you may have to depress the locking tabs when inserting).
See Figure 2-2.
When the server has been pushed completely into the rack, you should
hear the locking tabs "click". Finish by inserting and tightening the
thumbscrews that hold the front of the server to the rack.
Figure 2-2. Installing the Server into a Rack
(with optional front bezel shown)
2-5

Advertisement

Table of Contents
loading

Table of Contents