Aiwa XD-DV290K Service Manual page 10

Aiwa xd-dv290 dvd player service manual
Table of Contents

Advertisement

Fig-(D)
GEAR EMERGENCY
(S6)
GEAR PULLY
CAM LOADING
Fig-(C)
BELT LOADING
MOTOR ASSEMBLY LOADING
CONNECTOR(2 PIN)
11. Base Assembly Main (Fig-11)
11-1. Holder Assembly Deck On
1) Push the Locking tabs (L5) at bottom side of the Holder
Assembly Deck On in direction of arrow (A) and
separate to bottom side. (See Fig-(A))
11-2. Frame Assembly Up/Down.
1) Push the two Locking tabs (L6) and lift up the Frame
Assembly Up/Down.
Note: When reassembling, insert the Lever (R1) of the
Frame Assembly Up/Down to the Groove (R2) of the
Gear Emergency and lock the two Locking Tabs
(L6). (See Fig-(B))
11-3. Rubber F
11-4. Belt Loading
11-5. Gear Pulley
1) Release the Screw (S6) and lift up the Gear Pulley.
Fig-(B)
(R1)
(R2)
GEAR LOADING
(L6)
(S7)
(L7)
Fig-(E)
Fig-11
FRAME ASSEMBLY UP/DOWN
RUBBER F
BOTTOM SIDE VIEW
11-6. Gear Loading
11-7. Gear Emergency
Note: When reassembling, confirm that the Hole (A) of the
Cam Loading is aligned to the Hole (B) of the Gear
Emergency as Fig-(C).
For this alignment, place the Gear Emergency and
Cam Loading as Fig-(D), and then move the Gear
Emergency in direction of arrow (B) until these two
gears are aligned as Fig-(C).
11-8. Cam Loading
11-9. Motor Assembly Loading
1) Release two Screws (S7).
2) Unlock the Locking tab (L7) and separate the Motor
Assembly Loading to bottom side.
Note: When reassembling, confirm that the Connector (2
Pin) is aligned as Fig-(E)
11-10. Base Main
10
BASE MAIN
HOLDER
(L6)
ASSEMBLY
DECK ON
(L5)
(L5)
(A)
Fig-(A)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xd-dv290ezXd-dv290kbXd-dv290ezbXd-dv290

Table of Contents