must be inspected once yearly to ensure that no degradation of packing
material or external equipment surfaces is taking place.
Humidity requirements may be exceeded for short periods of time, providing
that the equipment is packaged in a manner suitable for export; i.e., with an
asphaltic barrier paper seal in a wooden container.
For a storage period extending up to 5 years, the storage environment must
be an inside-heated environment with a visual inspection performed
annually:
a.
Receiving Inspection - Procedures to be performed on the equipment
to be stored include inspection of the packaging and enclosed
equipment
completeness. One copy of the appropriate damage or shortage report
is to be transmitted to Diamond Electronics immediately.
b.
An inspection log is to be maintained with this equipment with all
inspection log entries signed and dated by the inspector.
inspection logs should also contain the date the equipment is required
to be shipped.
c.
A separate inspection log must be maintained for each different type of
equipment and purchase order.
2.3

HANDLING PROCEDURES

Most Diamond Electronics equipment is packaged with the protection of
"foamed-in-place" polyurethane dunnage. The polyurethane molds itself around
each object to provide an upper and lower enclosure. Each container and its
plastic-covered polyurethane enclosures should be stored for reuse in the event
that shipment of any item becomes necessary.
No item should be removed from its shipping container for any prolonged period
of time until it is ready for permanent installation. All handling of equipment
for damage
and
2-3
inventory
of
the
equipment
for
The

Advertisement

Table of Contents
loading