Installation Procedures; Summary - HP ProCurve 2510G Series Installation And Getting Started Manual

Hide thumbs Also See for ProCurve 2510G Series:
Table of Contents

Advertisement

Installing the Switch

Installation Procedures

Figure 2-1. Air flow direction of the 2510G switch
Installation Procedures

Summary

Follow these steps to install the switch. The rest of this chapter provides
details on these steps.
1.
2.
3.
4.
5.
2-4
Prepare the installation site
ment is properly prepared, including having the correct network cabling
ready to connect to the switch and having an appropriate location for the
switch. Please see
page 2-3
Install mini-GBICs
(optional—page
installing mini-GBICs. Depending on where you will install the switch, it
may be easier to install the mini-GBICs first. Note that mini-GBICs can be
hot swapped—they can be installed or removed while the switch is
powered on.
Verify the switch passes self test
power source and observe the LEDs on the switch's front panel that they
indicate correct switch operation.
Mount the switch
(page
mounted in a 19-inch telco rack, in an equipment cabinet, on a horizontal
surface, or on the wall.
Connect power to the switch
plug it into the nearby main power source.
(page
2-5). Ensure the physical environ-
for some installation precautions.
2-7). The switch has four slots for
(page
2-9). Plug the switch into a
2-11). The Switch 2510G Series devices can be
2-14). Once the switch is mounted,
(page