Download Print this page

Low Row Cable Routing - Life Fitness SM83 Unpacking And Assembly Instructions

8 stack multi-jungle with 3 adjustable pulleys

Advertisement

SM83 Unpacking & Assembly Instructions
Figure 18. Adjustable crossover cable end detail.
Using a 7/8" wrench, tighten the jam nut onto the adjustable pulley threads as shown in Figure
18. Place a rubber cap on the top of the cable as shown in Figure 18 (right).

LOW ROW CABLE ROUTING

Route the low row cables as shown in Figure 19.
Figure 19. Low row cable routing.
15

Advertisement

loading