Safety Warning - KOBE RA9230SQB Installation Instructions And Operation Manual

Ra-092 series – 12" height
Table of Contents

Advertisement

Available languages

Available languages

4. Secure and tighten the mounting screws.
CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
Ductwork Installation
5. Using Reference E from Table 1 and
measurements on Page 13, mark the
leveling point for duct cover-mounting
bracket.
6. Secure the duct cover-mounting bracket to
the wall with two screws (not provided).
(Figure 6)
Make sure all screws are
tightened.
NOTE: Inner duct cover will
cover the duct cover-mounting bracket.
7. Use aluminum or steel pipe (not provided)
to connect the plastic exhaust on the hood
to the ductwork above. Use duct tape to
ensure all joints are secure and air tight as
shown in Figure 7.
Wiring to Power Supply

SAFETY WARNING

RISK OF ELECTRICAL SHOCK. THIS RANGE
HOOD MUST BE PROPERLY GROUNDED.
MAKE
SURE
THIS
SPECIALIZED
ACCORDANCE
WITH
NATIONAL
AND
CODES.
BEFORE CONNECTING WIRES,
SWITCH POWER OFF AT SERVICE PANEL
AND LOCK SERVICE PANEL TO PREVENT
POWER
FROM
BEING
ACCIDENTALLY.
8. Connect three wires (black, white and
green) to house wires and cap with wire
connectors.
Connect according to color:
black to black, white to white, and green to
green as shown in Figure 8
9. Test the operation of the hood before
performing the next step. Make sure power
is supplied to the hood.
Duct Cover Installation
10. Slide inner duct cover up 2 inches
before sliding entire duct cover onto the
hood. (Figure 9)
11. Align the inner duct cover to the duct
cover-mounting bracket. Secure
IS
DONE
BY
ELECTRICIAN
ALL
APPLICABLE
LOCAL
ELECTRICAL
SWITCHED
ON
Figure 5
Figure 6
A
IN
Figure 7
Figure 8
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ra9236sqb

Table of Contents