Glow-worm Swift flow 120 Installation Instructions Manual page 20

Fanned flue combination boiler
Table of Contents

Advertisement

10.1 Mounting the Boiler
After installing the flue, boiler mounting frame, gas,
domestic and heating systems, making the electrical
connections and preparing the flue components, continue
as below:
Lift the boiler into position, hooking it onto the boiler
mounting frame at the top, fully push the boiler back to
the mounting frame, locating the studs into the clips,
then loosely fit the two boiler securing screws at the top,
see diagram 10.1.
10.2 Internal Flue Fixing
Fit gasket to flue elbow.
Secure the flue assembly to the boiler, see diagram 10.1.
Fit the fan to the flue elbow spigot making sure the fan
sealing ring is fitted correctly and secure with the
previously removed screws.
Secure the flue collector thumb screws.
10.3. External Flue Fixing
Fit gasket to flue elbow.
Locate flue elbow onto the boiler.
Fit the fan to the flue elbow spigot making sure the fan
sealing ring is fitted correctly and secure with the
previously removed screws.
Secure the flue collector thumb screws.
Pull the flue/air duct(s) forward and engage onto the flue
elbow, see diagram 10.2. Check the wall face to
terminal dimension, see diagram 7.6.
Push the air duct back into the wall sleeve, whilst
holding the flue duct onto the flue elbow, then secure the
flue duct to the elbow, see diagram 10.2.
Pull the air duct back into engagement with the flue
elbow and secure/seal.
10.4 Gas and Water Connections
Locate the boiler water pipes into the isolation valves
and the gas service into the gas cock union halves.
Make the compression joint on the isolating valves and
join the gas service cock union. Secure all of the valves
and gas service cock with the clips.
10.5 Boiler Securing
Secure the boiler by tightening the two boiler securing
screws at the top.
220674B
Supplied By www.heating spares.co Tel. 0161 620 6677
1 0
B o i l e r
20
F i x i n g
FLUE ELBOW/
AIR DUCT
SECURING
SCREW (4)
BOILER SECURING
SCREW (2)
WALL
SLEEVE
FLUE DUCT
AIR DUCT/
TERMINAL
AIR DUCT/
FLUE DUCT
TERMINAL
AIR DUCT/
TERMINAL
Diagram 10.1
WALL FACE
FLUE
ELBOW
FLUE
ELBOW
3mm Drill
Sealing
Tape
FLUE
DUCT/
ELBOW
Diagram 10.2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Swift flow 120 and is the answer not in the manual?

Questions and answers

Table of Contents