Mounting Frame Connections - Worcester GREENSTAR HIGHFLOW 440CDi Instruction Manual

Floor standing rsf gas-fired condensing combination boiler installation commissioning & servicing
Hide thumbs Also See for GREENSTAR HIGHFLOW 440CDi:
Table of Contents

Advertisement

A
B
C
D
INSTALLATION & SERVICING INSTRUCTIONS
8 716 115 219c (03.2010)
E
MOUNTING FRAME
CONNECTIONS
CAUTION: ISOLATE THE MAINS GAS
SUPPLY BEFORE STARTING ANY WORK
AND OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
GAS AND WATER CONNECTIONS:
Ensure all pipework is clean and each
pipe is in the correct position as shown
opposite.
Push in each pipe in turn and tighten the
fitting to secure.
A - CH flow (22mm)
B - DHW flow (22mm)
C - Gas inlet (22mm)
D - Mains water inlet (22mm)
E - CH return (22mm)
F - Mounting frame.
F

MOUNTING FRAME CONNECTIONS

21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar highflow 550cdi

Table of Contents