Condensate Pipework - Worcester GREENSTAR HIGHFLOW 440CDi Instruction Manual

Floor standing rsf gas-fired condensing combination boiler installation commissioning & servicing
Hide thumbs Also See for GREENSTAR HIGHFLOW 440CDi:
Table of Contents

Advertisement

Visible air break
at plug hole
Condensing
Boiler
100mm
22mmØ
plastic pipe
75 mm
min.
75mm sink
waste trap
22mmØ
Condensing
Boiler
Invert
22mmØ condensate
drainage pipe, max external
length 3 metres
500mm min.
Diameter 100mm
min. plastic tube
Bottom of
tube sealed
Limestone
Hole depth
chippings
400mm min.
by 300 Ø
22 mm Ø plastic condensate
drainage pipe running
through the external wall
Condensing
Boiler
INSTALLATION & SERVICING INSTRUCTIONS
8 716 115 219c (03.2010)
Sink with
integral
overflow
Insulation or
increase pipe size
Open end of
condensate drainage
pipe directly into gully
below grating but
above water level
Soil & vent stack
minimum
450mm
and up to
3 storeys
Insulation or
increase pipe size
Condensate drainage pipe can be
run above or below ground
25mm
Drainage holes
External rain water
pipe into foul water
Insulation or
68 mm Ø PVC-u
increase pipe size
strap on fitting
43 mm 90°
M & F bend

CONDENSATE PIPEWORK

IMPORTANT:
CONDENSATE PIPEWORK:
External pipe work
Condensate soakaway
Fitting an external air break
External
air break
Air gap
32/43mm pipework, between the boiler
Ensure there are no
blockages in the pipe run
Care should be taken when
siting a soak-away to avoid
obstructing existing services
Condensate waste must not
be terminated into a septic
tank or cesspit
The condensate pipe must be a minimum of
22mm Ø plastic pipe.
The condensate pipework must fall at
least 50 mm per metre towards the outlet
and should take the shortest practicable
route.
The pipework must follow one of the options
shown opposite or discharge directly into a
vent stack min. 450mm above pipe invert or
into a gully below ground but above the water
level.
Wherever possible the condensate
discharge pipe work should be routed and
terminated internally. Should this not be
possible, and the only available route is
external, the following conditions should be
observed:
-
Pipe work length should be kept to a
minimum and the route as vertical as
possible.
-
Where pipe work is subjected to
extreme cold or wind chill, a weather
proof insulation should be used.
Alternatively the condensate pipework
could be increased to a minimum
diameter of 32mm without the
insulate.he pipe run
requirement to
The condensate drainage pipe may be run
above or below the ground to the soakaway.
The example shown opposite runs above
ground level.
The soakaway must use a 100mm diameter
plastic tube with two rows of three 12 mm
holes on 25 mm centres and 50 mm from
the bottom of the tube. The holes must face
away from the house.
The tube must be surrounded by at least
100 mm of limestone chippings t o a depth
of 400mm.
Use the situation opposite when a rain water
down pipe is used to dispose of condensate
and the down pipe goes directly into an
existing sewer that carries both rainwater
and foul water.
An air break must be installed in the
condensate outlet and the drainpipe, outside
the property, to avoid flooding during
adverse weather conditions.
CONDENSATE
PIPEWORK
11