Rinnai ENERGYSAVER EX08C Installation Fundamentals page 54

Direct vent wall furnace
Hide thumbs Also See for ENERGYSAVER EX08C:
Table of Contents

Advertisement

Connecting the Vent Flue
The following components can be connected by reaching behind the appliance as it is positioned against the wall
3. Fit the locking clamp over the connection between the
sliding tube and manifold. Engage the hook and rotate it
until it snaps against the body of the clamp.
CONNECTING THE VENT FLUE (continued)
Insulation
sleeve
4. Slide the insulation sleeve up to
the flue manifold. Slip the securing
clips over the sleeve as shown.
54

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents