Rinnai ENERGYSAVER EX08C Installation Fundamentals page 51

Direct vent wall furnace
Hide thumbs Also See for ENERGYSAVER EX08C:
Table of Contents

Advertisement

Final Gas Line Preparation
Tip: Using a flexible appliance gas line will enable the furnace to be slid into place with minimal effort.
1. Ensure all connections
are properly tightened
and sealed with pipe
dope or Teflon tape.
IMPORTANT: Ensure all code and gas line sizing requirements are followed. Shut off
valve should be located in a manner that allows the unit to be removed for field service.
NOTE: If flexible gas line is not used, first complete the next step (sliding the furnace
ATTACHING THE GAS CONNECTION (Part 2)
2. Attach the included shut off
valve and field supplied
flexible gas line to the wall
supply and furnace. Leak test
all connections.
into place), then attach gas line accordingly.
3. NOTE: Many models will
allow the gas valve to be
positioned behind the back
spacer but still accessible
by the consumer.
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents