Rinnai ENERGYSAVER EX08C Installation Fundamentals page 48

Direct vent wall furnace
Hide thumbs Also See for ENERGYSAVER EX08C:
Table of Contents

Advertisement

Vent Termination
INSTALLING THE OUTER VENT TERMINAL
1. From the
outside, insert
the terminal into
the sleeve with
the marking
"TOP" at the top.
The left hand
side locking tie
should be
marked "LEFT."
2. For weather
board walls (lap
siding), add the
second seal next
to the terminal
seal to
compensate for
siding angle.
3. On the inside,
Terminal Seal
4. Cut the ties,
Additional angled
seal for lap siding
Practice good safety habits when using
CAUTION
power equipment and sharp tools!
pull hard on the
left and right
hand ties. Clip
the ties over the
notches inside
the sleeve. The
ties should pull 2
or 3 notches
past the starting
point.
leaving about ¾"
(20mm) past the
notch. Bend the
excess back and
parallel to the
wall.
Lock in notches
48