Toshiba RAV-SM564UTP-E Service Manual page 98

Hide thumbs Also See for RAV-SM564UTP-E:
Table of Contents

Advertisement

No.
Part name
Heat
11
exchanger
SVM-13010_051-106.indd 98
SVM-13010_051-106.indd 98
Procedure
1. Detachment
1) Recover the refrigerant gas.
2) Carry out work of item 1 of
3) Remove refrigerant pipe at indoor unit side.
4) Remove the fixing screws and then
remove the piping cover. (Ø4 × 10, 3 pcs.)
5) Remove the drain hose from the drain
pump and remove the fixing screws to
remove the drain pump stand.
(Ø4 × 8, 3 pcs.)
6) While pushing the heat exchanger, remove
the fixing band, fixing screws and the heat
exchanger. (Ø4 × 8, 3 pcs.)
2. Attachment
1) Mount the heat exchanger with the fixing
band and the fixing screws. (Ø4 × 8, 3 pcs.)
2) Fix the parts as before in order of drain
pump stand → piping cover.
3) Connect the refrigerant pipe as before and
then apply vacuuming.
4) Following to work of item 2 of
the parts as before.
Fixing band
Heat exchanger
10
.
Fixing screws (Ø4 × 10)
Fixing screws (Ø4 ×10)
Drain pump stand
Drain pump stand
10
, attach
Fixing screws
(Ø4 × 8)
Fixing screw
Fixing screw
Fixing band
Fixing band
– 98 –
FILE NO. SVM-13010
Remarks
Piping cover
Fixing screws
Fixing screws
(Ø4 × 10)
(Ø4 ×1 1 0 0 ))
2/1/13 2:49 PM
2/1/13 2:49 PM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents