5. After the charge is removed and pressure has equalized, remove Schrader valve cores (2 each).
6. Use the 90° copper elbow, included in the kit, to carefully mark the tube-cut locations on the drier inlet
and outlet.
7. Use tubing cutter to cut-out filter/drier. Cap both tube openings.
8. Carefully make the tube-cut locations on the hot gas valve outlets at 1-3/8" from the backside of the copper
T, as shown. Cut hot gas valve inlets, 2 each, with imp tubing cutter.
9. Remove insulation on hot gas valve inlet line (if present).