Connecting The Battery Backup Unit To The System - BT Versatility Installation And Maintenance Manual

Hide thumbs Also See for Versatility:
Table of Contents

Advertisement

BT Versatility
Installation and Maintenance Manual
Analogue line module

Connecting the battery backup unit to the system

The Battery back up provides full operation of the system for approximately one hour
in the event of a power failure. The battery will support 11 erlangs of voice traffic for
1 hour.
An erlang is a measure of telephony traffic.
1 erlang = 1 circuit fully occupied for 1 hour.
The Battery back up consists of the 12 V battery and the charger unit
Before installing the battery charger unit ensure that the system is
powered down by disconnecting the mains.
To install the unit, remove the blanking cover on the left side of the CCU.
Open the CCU main cover by releasing the four 'quarter-turn' screws.
Slide the BBU in about half way.
There are three cables connected to the charger unit. One with a connector, which
connects to the PSU, and two with spade connectors which are connected to the battery.
Connect the cable with the connector to the PSU.
Thread the two cables for the battery up the cable guide to the battery compartment.
Push the charger unit home.
Replace the CCU cover.
22
Battery charger
connector on the PSU

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents