Power Up And Test; Switch On; Commissioning - BT Versatility Installation And Maintenance Manual

Hide thumbs Also See for Versatility:
Table of Contents

Advertisement

BT Versatility
Installation and Maintenance Manual

Power up and test

• Ensure the mains plug is fitted with a 3A fuse.

Switch on

• Power up the system by inserting the mains plug.
• Wait approximately 30 seconds for the system power up routine to be complete.
• Check that the vital activity LED is flashing. This is the top led of the four LEDs in the
CCU MDF area.
• Check the Power led is lighting. This is the third led in the CCU MDF area

Commissioning

1. Remove any anti-scratch protective film from Featurephone LCD's.
2. Label up all Featurephones and other telephones.
3. Ensure that all Featurephones provide dialling tone, ringing and hands free (loud
speaking) facilities. Check that the display is not showing corrupt information.
4. Reset the system to default.
5. Check that all other telephones are connected. Make sure all these phones ring and
that you can dial from them.