Buderus Logano G515 Installation And Service Instructions Manual page 28

Low-temperature oil/gas boiler buderus logano g515
Hide thumbs Also See for Logano G515:
Table of Contents

Advertisement

7
Boiler block assembly
To fit the side panel sections, the side panel flaps must first be fastened
to the front side panels.
▶ Fasten the hinges to the side panel flaps beforehand using 2 self-
tapping screws in each case.
▶ Hook the hinge pins ( Fig. 49, [1]) on the side panel flap into the
cut-out of the front side panel and secure with self-tapping screws.
▶ Attach tension spring ( Fig. 49, [2]) to the side panel and side
panel flap.
2
Fig. 49 Fitting the side panel flaps
▶ Attach the side panels ( Fig. 50, [2]) on the bottom left and right
to the lugs in the base rails that have been bent upwards ( Fig. 50,
[1]) then push up over the folded edge of the longitudinal rails.
Fig. 50 Attaching the side panel sections
▶ Once the side panels ( Fig. 51 [2]) have been vertically aligned,
the self-tapping screws in the base rail ( Fig. 51, [4]) must be
tightened.
28
1
720 42 23-47.1o
2
1
720 42 23-48.1o
▶ Push the base rails that run crosswise ( Fig. 51, [1 and 3]) into the
base rails that run lengthwise from the front and back. The folded
edge on the cross plate must be at the bottom in each case, and point
toward the boiler ( Fig. 51).
1
Fig. 51 Mounting the base rails
▶ Attach the front cover ( Fig. 52, [1]) to the front side panels with
the two hooks ( Fig. 52, [3]).
▶ Screw the front cover to the longitudinal rails from below with two
self-tapping screws ( Fig. 52, [2]).
2
3
Fig. 52 Fitting the front cover
Before fitting the other parts of the cover, you must first
install the control panel, route the capillaries to the
sensor well and insert the sensor into the sensor well
( Chapter 9, page 32).
2
3
4
6 720 642 623-49.1o
1
720 42 23-50.1o
Logano G515 – 6 720 647 208 (2014/09)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents