Near Boiler Piping (Central Heating – Ch); Field Wiring - NTI VM110 Installation And Operation Instructions Manual

Vmax
Hide thumbs Also See for VM110:
Table of Contents

Advertisement

Vmax I&O Manual
Near Boiler Piping (Central Heating – CH)
Figure 10-2(a) VM110 Top – Option A
Inlet from Indirect Water Heater
(and location for boiler drain)
60 PSI Pressure Gauge
(factory supplied)
Tee Fitting - Typical
(field supplied)
Central Heat Outlet
Central Heat Inlet
Condensate Drain
Auto Air Vent
(factory supplied)
1x1/2x1" Brass Tee
(factory supplied)
1x3/4" Brass Bushing
(factory supplied)
30 PSI Relief Valve
(factory supplied)
3/4" Brass Street Elbow
(factory supplied)
Figure 10-2(c) VM110 Bottom
Figure 10-2(b) VM110 Top – Option B

│Field Wiring

Auto Air Vent
(factory supplied)
1x1/2x1" Brass Tee
(factory supplied)
1" Nipple
(field supplied)
30 PSI Relief Valve
(factory supplied)
1x1x3/4" Brass Tee
(field supplied)
Outlet to Indirect
Water Heater
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vm110p

Table of Contents