10
DISASSEMBLY PROCEDURE
PE-3EAK.TH
PE-4EAK.TH
PE-3EAK.TH-U
PE-4EAK.TH-U
OPERATING PROCEDURE
1. Removing the drain pan
! Unscrew each set screw on the right and left, and remove
the drain pan pushing it toward the back.
2. Removing the electrical parts
! Remove the electrical parts cover.
(set screw
2) and the parts as below
Indoor controller board
Power board
Fan capacitor
Terminal block
3. Removing the indoor coil thermistor
! Remove the drain pan.
@ Remove the electrical parts cover.
# Remove the set wire of the indoor coil thermistor.
PE-5EAK.TH
PE-6EAK.TH
PE-5EAK.TH-U
PE-6EAK.TH-U
Photo 1
(See Photo 1)
Drain pan
Photo 2
(See Photo 2)
(See Photo 3)
Photo 3
Terminal
block
Photo 4
(See Photo 1)
(See Photo 2 )
(See Photo 4)
56
PHOTOS&ILLUSTRATIONS
Room temperature
thermistor
Set screw
(for drain pan)
Indoor
controller board
Fan motor
Electrical
parts cover
Set
screw
Power board
Fan capacitor
Indoor coil
thermistor