Duct Cover Installation
5.
Use 8" aluminum or steel pipe (follow building
codes in your area) to connect the ducting
transition on the hood to the ductwork above.
Use duct tape to seal and secure joints as shown
in Figure 15. Slide the duct cover onto the hood.
6.
Use 3/16" x 3/8" screws (provided) to attach duct
cover to hood.
Final Assembly
CAUTION: Install heating lamps last.
7.
Drop Oil Tunnel into support structure. Refer to
Figure 7.
8.
Angle baffle filter toward back of hood
to Figure 8.
9.
Push baffle filter up until almost level
10.
Slide forward into recess at front of hood
11.
Lower baffle filter
resting position
12.
Repeat for all baffle filters and spacers. Refer to
Measurements and Diagrams on page 21 for
baffle filter and stainless spacer arrangement.
13.
Install heating lamps (not provided), 120 Volts
175 Watts max. each.
14.
Turn power ON in control panel. Check all
lights and fan operation.
15.
Make sure to leave this manual for the
homeowner.
and slide back until it fits into
.
. Refer
.
.
11
Figure 15
Figure 16
Figure 17