Ductwork Installation; Wiring To Power Supply; Final Assembly - KOBE CH0130SQB (30") Installation Instructions Manual

Ch-101 series – 18'' height 30/36/42/48"
Table of Contents

Advertisement

Ductwork Installation

7. Use 8" aluminum or steel pipe (follow building codes in
your area) to connect the ducting transition on the hood
to the ductwork above.
secure joints as shown in Figure 5.

Wiring to Power Supply

S A F E T Y W A R N I N G
TO PREVENT THE RISK OF ELECTRICAL SHOCK OR
INJURY, ALL RANGE HOODS SHOULD BE PROPERLY
GROUNDED
AND
PROFESSIONAL WHO IS KNOWLEDGEABLE ABOUT
APPLICABLE NATIONAL AND LOCAL ELECTRICAL
CODES.
BEFORE CONNECTING WIRES, SWITCH POWER OFF
AT SERVICE PANEL TO PREVENT POWER FROM
BEING SWITCHED ON ACCIDENTALLY.
8. Connect electrical wires.
-
Connect three wires (black, white and green) to
house wires and cap with wire connectors.
Connect wires according to their colors (i.e. black to
black, white to white, and green to green). See
Figure 6.
-
Prevent wires from slipping between motor and any
moving parts by securing in electrical box.

Final Assembly

CAUTION: Install heating lamps last.
9.
Drop Oil Tunnel into support structure. Refer to
Figure 7.
10. Angle baffle filter toward back of hood
Figure 8.
11.
Push baffle filter up until almost level
12. Slide forward into recess at front of hood.
13. Lower baffle filter
resting position
14. Repeat for all baffle filters and spacers. Refer to
Measurements and Diagrams on page 21 for baffle
filter and stainless spacer arrangement.
Use duct tape to seal and
INSTALLED
BY
.
and slide back until it fits into
.
A
TRAINED
. Refer to
7
Figure 5
Figure 6
Figure 7

Advertisement

Table of Contents
loading

Table of Contents