Download Print this page

HP JG221A Installation Manual: Verifying The Installation

A3100 v2 switch series a3100-8 v2 si switch, a3100-16 v2 si switch, a3100-24 v2 si switch, a3100-8 v2 ei switch, a3100-16 v2 ei switch, a3100-24 v2 ei switch, a3100-8-poe v2 ei switch, a3100-16-poe v2 ei switch, a3100-24-poe v2 ei switch.
Hide thumbs

Advertisement

Tighten the screws on the plug with a flat-blade screwdriver to secure the plug in the power receptacle
3.
(see callout 2 in
Connect the two wires at the other end of the power cord to a –48 VDC power source.
4.
Check the power LED (PWR) on the front panel. If the LED is on, the power cord is properly connected.
5.
CAUTION:
The length of a DC power cord must be shorter than 3 m (9.84 ft).

Verifying the installation

After you complete the installation, verify that:
The grounding cable is securely connected.
The selected power supply matches that required by the switch.
The power cords are properly connected.
Figure
34).
26

Advertisement

   Related Manuals for HP JG221A

Comments to this Manuals

Symbols: 0
Latest comments: