4.4. Switching off (diagram A)
When the generating set is turned off, the motor continues to give off heat.
Suitable ventilation should be provided after the generating set is turned off.
To stop the generating set quickly, turn the On/Off switch to stop "О".
Warning
❶ Disconnect the sockets and allow the motor to run without any load for 1 to 2 minutes.
❷ Turn the On/Off switch (No. 5, Diag. A) to off "О", the generating set switches off

5. Safety features (if fitted, see specifications table)

5.1. Oil cut-out
This mechanism is designed to prevent any damage to the motor resulting from lack of oil in the motor sump. It automatically cuts out
the motor. If the motor stops and will not restart, check the motor oil level before looking for any other cause of the problem.
5.2. Circuit breaker
The electrical circuit of the set is protected by several magnetothermal, differential or thermal cut-out switches. Any overload and/or
short circuits cause the supply of electrical energy to be cut.
5.3. Overload
When there is electrical overload, the overload indicator turns on and electrical current production cuts out in less than 20 seconds.

6. Maintenance schedule

6.1. Reminder of use
The maintenance interval frequency and the operations to be carried out are outlined in the maintenance programme.
However, it should be added that it is the environment in which the generating set is operating which determines this programme.
Accordingly, if the set is used in extreme conditions, shorter intervals between maintenance procedures should be adopted.
These maintenance schedules apply only to generating sets running on fuel and oil, that conform to the specifications given in this
booklet.
6.2. Maintenance table
carry out the maintenance
first
Motor oil
Air filter
Spark
plug
Cleaning the generating set
Valves (2)
Fuel filter (2)
(1) more frequently if the operating conditions are difficult
(2) these operations must be carried out by one of our agents
6/10
Each time
procedures
it is used
at whichever
deadline is reached
first
Check the level
Change
Check
Clean
Check / clean
Replace
Check / adjust
Clean
first month
Every 3
or first ten
months or
months
25 hours
hours
• (1)
Every 6
1 year or
months or
100 hours
50 hours
Once per year
Once per year
2 years or
300 hours

Advertisement

Table of Contents
loading

Table of Contents