Checking Off To Do List Items; Changing Priorities And Due Dates - Meazura MEZ1000 User Manual

Table of Contents

Advertisement

3.
Tap the Priority number that you want to set, with 1 the most important and 5 the least
important.

Checking off To Do List items

You can check off a To Do List item to indicate that you've completed it.
1.
In the To Do List, tap show. Tap Show Completed Items. If you clear this setting, your To Do
items disappear from the list when you complete (check) them.
NOTE
Items that no longer appear on the list because Show Completed Items is turned off have not been
deleted. They are still in the memory of your RDA. You must purge completed items to remove
them from memory.
2.
Tap the check box on the left side of the item.

Changing priorities and due dates

You can change the To Do List to display the due date assigned to an item, change its priority, and
assign a category to the task with the To Do Item Details dialog box.
You can then sort To Do List items by priority, due date, or category.
1.
In the To Do List, tap the item that you want to change.
2.
Tap Details.
3.
In the Details dialog box, tap No Date to open the Due Date pick list.
4.
Tap the date that you want to assign the item. Options are Today, Tomorrow, One Week from
the current date, No Date to remove the due date from the item, or Choose Date to display the
Using the To Do List (Working with Applications)
Tap here.
Tap to
select
priority
Completed
To
Do List item.
Tap here.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents