Scheduling A Timed Event For Another Date; Scheduling Untimed Events - Meazura MEZ1000 User Manual

Table of Contents

Advertisement

TIP
You can open the Set Time dialog box (to select a start time) by making sure no event is selected,
and then writing a number on the number side of the text input area.
5.
Set the duration of the event in either of the following ways:
· Tap the time columns in the Set Time dialog box to set the Start Time; Tap End Time; then
tap the time columns to set the End Time.
· Tap All Day if the event lasts all day. The default hours of a standard business day are set by
the user, and may be changed using the Preferences command in the Date Book. See the
section
"Changing the displayed Start and End
Start Time
highlighted.
6.
Tap OK.

Scheduling a timed event for another date

1.
Select the date you want in one of the following ways:
· Tap the desired day of the week in the date bar at the top of the screen. If necessary, tap the
Previous week or Next week scroll arrows to move to another week.
· Tap Go To at the bottom of the screen to open the Go to Date dialog box. Select a date by
tapping a year, month, and day in the calendar.
2.
After locating the desired date, follow the steps for scheduling an event for the current day.

Scheduling untimed events

You can schedule untimed events for any date. Untimed events appear at the top of the list of times
marked with a diamond.
1.
Select the event date you want, as described in the previous procedure, "To schedule a timed
event for another date."
2.
Tap New.
3.
In the Set Time dialog box, tap No Time.
NOTE
You can tap OK instead but make sure nothing is entered for start or end time.
Using the Date Book (Working with Applications)
Tap to scroll
to
earlier
hours.
Tap to change
hours.
Tap to change
minutes.
Tap to scroll
to later hours.
Times" later in this chapter.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents