INSTALLATION
Installation diagram of indoor unit and outdoor unit
Confirm the installation position by the mark of the indoor mounting plate.
or
The copper pipe can be led
from back, right, underside,
or left-back side.
front
back
right
back
Underside Left-back
While installing the pipeline on the
thin armor plate or on the wall of
metal mesh, you should use the
wooden board to clamp between
the wall and the pipeline, or wrap
up the pipeline with 7-8 layers of
insulating plastic tape.
3
or
or
Notice: do not elevate the
drain hose.
left
Cover connecting pipe with
adiabatic material.
Sponge plastic adiabatic
material with the
thickness of 8mm.