Vivax ACP-09CH25ZNM Service Manual page 9

Hide thumbs Also See for ACP-09CH25ZNM:
Table of Contents

Advertisement

INSTALLATION
Installation diagram of indoor unit and outdoor unit
1
Wiring
Wiring For
Above 6000W Model (Above 21000BTU/h Model)
1 Remove the self-tapping screws (2 pcs)
on the maintenance board and take out the
maintenance board.
Maintenance
board
2 Loosen the self-tapping screws (2 pcs) on
the fixing clip to loosen the fixing clip.
3 Loosen the fixing screw of the wire terminal
board, pass the power wire and signal wire
through the fixing clip. Then firmly fix the
power wire and signal wire on the terminal
board with the fixing screw. (Earth wire
must be connected firmly.)
Maintenance
board
Piping cover Ejecting hole
Outdoor unit terminal
Connecting
cable
or
Terminal board
Fix the cable wire
with anchor cable
Piping cover
Back wiring
Right wiring
The cable wire can be led from the back hole
of the piping hole or ejecting hole.
Please utilize outdoor pipe support when
the cable wire is led from the backside.
Outdoor pipe support
(Outdoor pipe support is not required
when leading the cable wire from other places).
4 Tighten the self-tapping screw on the fixing clip.
5 Install the maintenance board. After the pipes
and cable wire are installed, please seal the
sponge block as per drawing indication.
Sponge
7
Outdoor unit terminal
Connecting
cable
Piping cover

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acp-12ch35znm

Table of Contents