VERIFYING THE TUBING AND CONNECTIONS

1. Check Bypass Connections

Once plumbing is completed,
with the bypass/service knob in
the "bypass" position as shown
in
figure
15, open the main wa-
ter supply valve and check for
leaks in the bypass connection.
Open a cold water tap nearby
and let water run for a few min-
utes or until the system is free
of foreign materials (usually solder resulting from the
installation). Close the water tap when water runs clean.
If there are no leaks, open the inlet valve to the water
heater and restore power or gas setting on the water
heater.
2. Check the Flow to the
Resin Tank
Slowly move the bypass/
service knob in "service"
position and let water flow
into the mineral tank. This is
an indication that the unit has
purged itself of all air. See
figure
16.
3. Check the Drain Line
With the regeneration knob already in "service" position,
now rotate the knob clockwise into "backwash" position
17
© 2007-2013 Aquathin Corporation. All rights reserved.
closed
Fig. 15. turn the bypass
knobs perpendicular to
the valve in order to
"close" it, as shown.
open
Fig. 16. turn the bypass
knobs parallel to the valve
in order to "open" it, as
shown.

Advertisement

Table of Contents
loading

Related Products for Aquathin ASC25K/F

This manual is also suitable for:

Asc40k/fAsc45k/fAsc60k/f

Table of Contents