Line Voltage Wiring - Nordyne M3RL 060A AW Installation Instructions Manual

Direct vent (sealed combustion) forced air gas furnaces bw series;, bwt series
Hide thumbs Also See for M3RL 060A AW:
Table of Contents

Advertisement

any of the originalwire as suppliedwith the
furnacemustbereplaced, i t mustbe replaced
withwirehaving a minimum temperature r ating
of 105°C. R eferto thefurnacenameplate and
Table8 for electrical r equirements.
Line Voltage Wiring
The linevoltage(115volt)tothe furnacemust
be suppliedfrom a dedicatedbranchcircuit
containing the correctfuse or circuitbreaker
for the furnace.See Table8. An electrical
switchshouldbe readilyaccessible fromand
within sight of the furnace. See the Wiring
Diagram labelin the furnace for moredetails.
The furnacecabinetmust have an uninter-
rupted,unbrokengroundto minimizeinjury
shouldan electrical f aultcondition occur.The
controlsusedin this furnacerequirean earth
groundto operate properly.Acceptable meth-
odsforgrounding areelectrical wireor conduit
approved forelectrical g roundservice. D o not
usegas pipingas an electrical g round.
NOTE:Properline voltagepolaritymust be
maintained in orderfor the controlsystemto
operate correctly. Verifythattheincoming neu-
tral lineis connected to thewhitewireandthe
incoming "hot"line is connected to the black
wireinthefurnace junctionbox.Thefurnace will
not operateunless polarityand ground are
properlyconnected. See Figure26.
/!X CAUTION:
Label all wires prior to disconnection
when servicing
controls.
Wiring
errors
can
cause
improper
and
dangerous
operation,
Verify proper operation
after servicing,
::ul_l
_OM
_
BIowerOff
Timing
24 V
TWIN
Flame Signal
Light (Yellow)
O
Status
Light (Red)
O
Common
Leads
Neutrals
> Z/]
_
Unused Motor
Connect
I o _
Leads
Neutral
_
_
_
_
3:
©
x
Lead o f
_
Ir_nq _ _ _ _ _ o° _- _
AirCI .....
IIIIII
II
.....
I
11
Elect
and/or
Humidifier
H....
tl
If
/
I
LElectronic
Air Tap
Humidifier
Tap |
(.5A@
120 VAC)
(.5A@ 120 VAC)
_
I
These motor speed taps are
L not used for two-stage
models
Figure
27.
Blower
Speed Tap Location
Furnace
Cabinet
Nominal
Maximum
Minimum
Input
Width
Electrical
Operating
Operating
(Btuh)
(in.)
Supply
Voltage
Voltage
45,000
19 3/4
115-60-1
127
103
80,000
19 3/4
115-60-1
127
103
Time-delay fuses or HACR-type circuit breakers are required.
Thermostat
Wire Gauge
24
22
2O
18
Maximum
Minimum
Furnace
Wire
Amperes
Gauge
9.7
14
9.7
14
Maximum
Fuse or Circuit
Breaker Amps _
15
15
Recommended
Thermostat
2 - wire
(Heating)
55 ft.
90 ft.
140 ft.
225 ft.
Wire Length
4 or 5 wire
(Cooling)
25 ft.
45 ft.
70 ft.
110 ft.
Table 8. Electrical
Data
Field Supplied
Field Supplied
Fused
Service
Disconnect
w/in
Panel
Sight of Furnace
\
\
Wh e (Neu ra)
|
White
/, "_
Gr;:nor-=ar:
...."1 . ... I.......... L-_L-_.-_L-:
_r_nd_ F--_---7
....._---
[
Ground
......
Field Line Voltage Wiring
__
Factory
Line Voltage Wiring
Junction
Box (may
be int. or ext.
to the
furnace).
These
connections
can
be made
in the field
supplied
disconnect
at the furnace.
White
Panel
Connector
Ground
Figure
26.
Line Voltage
Field Wiring
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents