Installation Requirements; Tools And Parts - KitchenAid W10117506B Installation Instructions And Use And Care Manual

Outdoor built-in sear burner
Table of Contents

Advertisement

Available languages

Available languages

Gather the required tools and parts before starting installation. Read and follow the instructions provided with any tools listed here.
20 lb LP Gas Models
Tools Needed
Tape measure
Small, flat-blade screwdriver
Flat-blade screwdriver
#2 and #3 Phillips screwdriver
Level
Parts Supplied
Gas pressure regulator/hose assembly set for 11" WCP LP
gas (attached to manifold)
1 single-prong plug/5,000 mAmp transformer assembly
Convertible regulator set for 4" WCP Natural gas
Orifices for Natural gas conversion
LP gas fuel tank tray
Parts Needed
20 lb LP gas fuel tank - approximately 18" (45.7 cm) height
and 12" (30.5 cm) diameter

INSTALLATION REQUIREMENTS

Tools and Parts

Wrench or pliers
Pipe wrench
Scissors or cutting pliers
(to remove tiedowns)
Noncorrosive leak-
detection solution
Natural Gas Models
Tools Needed
Tape measure
Small, flat-blade screwdriver
Flat-blade screwdriver
#2 and #3 Phillips screwdriver
Level
Parts Needed
Gas line shutoff valve
½" male pipe thread nipple for connection to pressure
regulator
LP gas-resistant pipe-joint compound
CSA design-certified outdoor flexible stainless steel
appliance connector (4-5 ft [1.2-1.5 m]) or rigid gas supply
line as needed.
Parts Supplied
Convertible regulator set for 4" WCP Natural gas.
Single-prong plug/5,000 mAmp transformer assembly
Wrench or pliers
Pipe wrench
Scissors or cutting pliers
(to remove tiedowns)
Noncorrosive leak-
detection solution
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kbeu121tssKbeu121vss

Table of Contents