Advertisement

1.
Identification of external components
2.
Features
3.
Accesories
4.
Installation of coffee machine
5.
Water filling in the boiler
6.
Main power switch
7.
Pressure gauge
8.
Machine start-up
9.
Portafilter locking into the group
10.
Coffee brewing
11.
Control panel
11.1 Electronic control panel features
11.2 Programmation dosage of the electronic control panel
11.3 Electronic control panel alarms
12.
Heating-up liquids
13.
Hot water for infusions
14.
Coffee machine with built-in grinder
15.
Cleaning of coffee machine
16.
Cleaning of group
17.
Water softener device
18.
Possible failures
19.
Pieces of advice
20.
Cautions
PLEASE READ CAREFULLY THIS INSTRUCTIONS MANUAL BEFORE INSTALLING
OR USING THE COFFEE MACHINE
1.
Identification of external components
3. Hot water knob
2. Boiler pressure gauge
1. Steam knob
12. Water level indicator
11. Manual boiler
refill
10. Grouphead
INDEX
4. Coffee brewing button
5. Touchpad
8. Main power switch
9. Portafilter
ENGLISH
Pag. 9
Pag. 10
Pag. 10
Pag. 10
Pag. 11
Pag. 11
Pag. 11
Pag. 12
Pag. 12
Pag. 12
Pag. 13
Pag. 14
Pag. 14
Pag. 14
Pag. 15
Pag. 15
Pag. 16
Pag. 16
Pag. 16
Pag. 16
6. Signal light
Fig. 1
7. Adjustable leg
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the COFFEE MACHINE and is the answer not in the manual?

Questions and answers

Summary of Contents for Expobar COFFEE MACHINE

  • Page 1 11.2 Programmation dosage of the electronic control panel 11.3 Electronic control panel alarms Heating-up liquids Pag. 14 Hot water for infusions Pag. 14 Coffee machine with built-in grinder Pag. 14 Cleaning of coffee machine Pag. 15 Cleaning of group Pag. 15 Water softener device Pag.
  • Page 2: Hydraulic Installation

    -Wiring: Wiring of coffee machine must be done by qualified staff, always following the safety instructions: Before plug in the machine, make sure the voltage of the supply mains correspond to the ratings indicated on the nameplate featuring the appliance´s technical data.
  • Page 3: Main Power Switch

    The manufacturer is not liable for the injuries or damages on people and/or animals, as well as damages on equipment, caused by a improper installation of the coffee machine. Water loading in the boiler The water level must be between the maximum and the minimum level. To increase the water level press the manual boiler refill.
  • Page 4: Portafilter Locking Into The Group

    Machine start-up Open the water by-pass valve, which is outside of the coffee machine. If the machine has optical level indicator, fill the boiler between the minimum and maximum level. Turn ON the main power switch, -see (8)Fig. 1-. Turn the steam knob until steam comes out.
  • Page 5: Electronic Control Panel Features

    CONTROL MODEL Proceed as in Pulser model. Fill the filter basket with the right amount of coffee, and press the desired option on the switchboard. The switchboard is already programmed with 4 standard doses (if you want to modify them, see setting) and a continuous coffee button.
  • Page 6: Electronic Control Panel Alarms

    • Open up the water knob, -see (3) Fig. 1,- until you have the desired volume of water. • Close it down. 14. Coffee machine with built-in grinder BEAN HOPPER LID BEAN HOPPER BEAN HOPPER GATE COFFEE GRINDING ADJUSTMENT DISK...
  • Page 7: Cleaning Of Group

    Regulation nut Dosage device lever Fig. 9 15. Cleaning of coffee machine Disconnect the machine from the main supply to make this process. All the body truck could be cleaned with a damp cloth. Do not use abrassive products or dissolvents.
  • Page 8: Pieces Of Advice

    • Coffee comes out very slow: Adjust the grinder setting, the grind is too fine. If you observe any anomaly in the coffee machine turn to the technical service. 19. Pieces of advice • You should clean every day the group without soap, only with the membrane and water.

This manual is also suitable for:

PulserLevaControl

Table of Contents

Save PDF