Parallel Control Bus Connection - GE Digital Energy SG Series Installation Manual

Uninterruptible power supply 10, 20, 30 and 40 kva
Hide thumbs Also See for Digital Energy SG Series:
Table of Contents

Advertisement

g

3.10 PARALLEL CONTROL BUS CONNECTION

In cases of parallel operation, the communication between the units takes place through the
control bus cables.
Each parallel unit is equipped with an additional board "P13 – RPA Board IM0006" where the
connectors J52 (A) and J62 (B) are located.
A short control cable provided with a ferrite ring core links the parallel board "P13 – RPA
Board IM0048" with the parallel bus socket on which must be connected the control bus
cables JA and JB on PCB "P34 – Bus Interface IM0048".
All the parallel units are connected to the same control bus.
This connection allows:
The microprocessors of each unit to communicate with each other.
The oscillators of each unit to be locked together.
The regulation loops to compare the output current of each unit in order to equally share
the load current.
For increased reliability, this connection is made with redundant cables.
In this way, communication is maintained between units in case one of the control cables
should fail or be accidentally damaged or disconnected.
The standard length of the control bus cable between two parallel unit is 40 ft / 12 m.
Maximal overall length of bus connection, between the first and the last unit, should not be
longer than 276 ft / 84 m.
Verify that control wiring is run in individual separate steel conduit.
Under no circumstance should the control bus cable connecting JA
(1/2/3/4/5/6/7) and JB (1/2/3/4/5/6/7) be connected or disconnected after the
system has been powered On.
UPS 1
JB1
JP4
JA1
JP3
JA1 + JB1
The shield of the control bus cable, connected on JA and JB must be connected to
ground with the appropriate cable clamps fitted on parallel bus socket.
It is important to place the units in sequence of their assigned number.
A unit number from 1 to 8, is defined by the setting of parameters and displayed on the panel.
This number is also marked inside and outside the packaging.
OPM_SGS_ISG_10K_40K_0US_V010.doc
JP1
JP2
IM 0048
JP2
JP1
JP4
JP3
Fig. 3.10-1 RPA System - Control bus connection
37/45
UPS 2
JB1
JP1
JP2
JB2
IM 0048
JP2
JP1
JP4
JP3
JA1
JP4
JP3
JA2
JA2 + JB2
Installation Guide SG Series 10, 20, 30 & 40 kVA
GE
UPS 3
JB2
JP1
JP2
JB3
IM 0048
JP2
JP1
JP4
JP3
JA2
JP4
JP3
JA3
Next parallel
JA3 + JB3
unit 4,5,6,7,8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents