Friedrich Breeze BRO412W1A Installation Instructions Manual page 6

Table of Contents

Advertisement

STEP 7 – Connect the quick connector from the indoor line set to the outdoor
module.
1. Open lock handle on line-set connec-
tor by pulling back and rotating toward
indoor unit.
2. Grasp outer lock collar on line-set con-
nector and pull back until it stops.
3. While holding outer lock collar reward,
push line-set connector body over base
1.
If you have excess connecting line, roll the line into a coil approximately 2
feet wide, secure with the provided wire ties and store between the outdoor
module and the wall. DO NOT cut or kink the connecting line!
STEP 8 – Connect the electrical connector from the
connecting line to outdoor module
1. Remove the electrical cord retention bracket by unscrewing
the two screws shown. Retain the bracket and screws.
2. Connect the black colored electrical connector from the con-
necting line into the mating connector on the outdoor module.
The connectors will snap into place with a click. (The plug can
be removed by pushing in the side tabs on the plug and pulling
the plug body down and out of the receptacle.)
3. Re-install the electrical cord retention bracket using two
screws removed previously. The opening in the electrical cord
retention bracket should fit over the cord. Do not pinch the
cord in the bracket.
4. Install the plastic cover as shown. There are two screws on
the outer flange of the cover and one screw under the electri-
cal connector access cover.
All Covers must be in place to operate unit.
SHOCK HAZARD exists without electrical access cover.
Cover cannot be installed without completing step 8.1 through 8.4
properly.
STEP 9 – Locate the condensate drain.
The connecting line has a built in condensate line hose that removes the
moisture collected from the indoor module. The hose must be located in
an appropriate location for drainage. Because the hose relies on gravity
to drain, it is important that the hose only points downward for the entire
length of the hose.
If the connecting line is rolled to store the excess line as in Step 6, the drain
line may be removed from the connecting line as shown below and cut to an
appropriate length.
connector on outdoor unit half way and
release outer lock collar.
4. Continue to push line-set connector
onto base connector until outer lock
color engages base connector. The outer
lock collar will snap into position with
base connector and a click will be heard.
2.
3.
5. Grasp lock handle and rotate to its
closed position.
6. Install security screw to prevent tam-
pering with line-set connector mecha-
nism.
4.
5.
6.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents