Appendix 3: Faceplate And Decorative Trims Installation - Flame Energy XTD 1.9 Installation And Operation Manual

Hide thumbs Also See for XTD 1.9:
Table of Contents

Advertisement

XTD 1.9 Insert Installation and Operation Manual

Appendix 3: Faceplate and Decorative Trims Installation

Note: The illustrations may vary from one model to another, but the method of assembly
remains the same.
Remove the faceplate panels from its box and the faceplate extension secured between
the firebox and the convection air jacket.
Place the faceplate panels with the finished side down on a flat, soft, non-abrasive surface
and follow the installation instructions below;
Hardware bag content:
8 - #10-24" x 1/2" bolts
8 - Trim retainer
52
2 - Corner bracket and screws
8 - #10-24" hex nuts
Line up the holes of the upper
faceplate panel (A) with the holes of
the side panels (B) and (C). Secure
them together using four (4) bolts (D)
and nuts (E) provided (see DETAIL
A).
Partially thread the screws (F) on the
trim's
superimpose the corner brackets (G)
and (H) as shown in the image on the
left.
corner
bracket
(G)
then

Advertisement

Table of Contents
loading

Table of Contents