Appendix 1: Blower Installation

First, attach the blower assembly to the
insert by aligning and inserting the hooks
on each side of the blower housing into the
slots located on the left and right of the
blower opening below the loading door (see
DETAIL A).
To assemble the ash lip, open the door to
facilitate the installation. Center the ash lip
with
the
blower
installed and push it against the firebox.
Then push down the rear fold of the ash lip
so it clips into the two (2) brackets welded
to the firebox located below the loading
door (see DETAIL A).
assembly
previously