Daikin FXHQ32AVEB Installation Manual page 13

Hide thumbs Also See for FXHQ32AVEB:
Table of Contents

Advertisement

(1) For rear side piping
• Remove the rear piping penetration cover, and connect the piping. (Refer to Fig. 16 and 18)
(2) For upward piping
• For upward piping, L-shaped connection piping kit (optional accessory) will be required.
• Remove the top panel penetration cover, and use the L-shaped connection piping kit (optional accessory)
to conduct piping. (Refer to Fig. 16 and 17)
(3) For right side surface piping
• Remove the stay for packing and delivering (reinforcing plate) at the right side, and put back the screw to
the original position of the indoor unit. (Refer to Fig. 18)
• Open the knockout hole at the decoration side panel (right), and connect piping. (Refer to Fig. 18)
View from air inlet side
Top panel penetration cover
Screw
(put back to the indoor unit)
Cut only this part when
laying only the drain
piping on the right side.
• After piping is finished, cut the removed penetration cover along the shape of piping, and install.
Also, for top panel penetration cover, as it was before removed, put the horizontal blade motor and ther-
mistor lead through the clamp of the top panel penetration cover and fix. (Refer to Fig. 16 and 19)
When doing this, block any gaps between the piping penetration cover and the piping using putty to prevent
dust from entering the indoor unit.
English
Rear piping penetration cover
Top panel
Cutoff
Stay for packing and delivering
(reinforcing plate)
Decoration side panel (right)
Separating parts
Cutoff
Cut at the position avoiding
the knob part of the penetration
cover
Fig. 16
Upward refrigerant piping
L-shaped branch piping kit
(Optional accessory)
Fig. 17
Rear side refrigerant piping
Rear side drain piping
Right side refrigerant piping
Right side drain piping
Fig. 18
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fxhq63avebFxhq100aveb

Table of Contents