Quooker PRO3-VAQ E Installation Manual page 8

Hide thumbs Also See for PRO3-VAQ E:
Table of Contents

Advertisement

B
Fitting Nordic tap
1
• NOTE: The total length of the hose between the boiling-water tap and tank is
• NOTE: The small fibre washers supplied with the tap rings are not required
1
3
only 70 cm. The tank must therefore be fitted close to the tap. Extension
hoses are available in different lengths but are not normally required.
yet at this point. One will be used for connecting the tap and tank hose (see
section E), the second one is a spare.
2
1 Tap through
work top
Push the tap through the hole in the
work top. NOTE: When fitting the tap
in a 32 mm hole, the black plastic ring
needs to be removed from the tap
first.
2 Securing the
tap
Set the tap to the desired position
and secure it with the metal ring and
screw ring supplied.
3 Securing tap
screws
Tighten the screws in the screw ring.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents