Welcome to the Quooker family. Read this manual before installing your CUBE. We assume that the user of this manual has some basic technical knowledge. If you still have any questions after reading this manual, please contact Quooker Service. Our address and telephone number are displayed on the back of this manual.
Installation, maintenance and warranty This manual is based on a Quooker system that has To install the CUBE, it must be possible to connect to the already been installed. For instructions on how to install the water mains and you need a free 13 amp power socket.
CUBE, remember that it must be easy to access for service and maintenance. In addition, at least 10 cm must be kept free at the back of the CUBE to allow warm air to ventilate. We recommend that you leave at least 2 cm extra space on both sides.
Declaration of conformity Quooker Nederland B.V., Staalstraat 13, 2984 AJ Ridderkerk (Netherlands) hereby declares at its own risk that the Quooker CUBE is manufactured in accordance with the rules in the following directives: 2014/35/EU Low Voltage Directive (LVD) 2011/65/EU Restriction of Hazardous Substances (RoHS) Directive...
Contents of the package CUBE CO ₂ cylinder filter power cable communication cable T-joint shut-off valve filter bracket CO ₂ reducing valve incl. transparent plastic hose and elbow connector blue striped hose white plastic hose white striped hose screws elbow connector...
Installing the filter bracket 1 Position the filter bracket 3 Attach the filter Position the bracket at least 5 cm below the sink or counter Remove the red cap from the new filter. Then screw on the top with at least 25 cm space between the bottom of the filter by turning it anticlockwise until it stops.
The entire installation at a glance Select your Quooker system on the next page to go directly to the correct CUBE installation instructions. CUBE...
Page 11
Flex PRO3 PRO7 COMBI+ Twintaps or Nordic single tap Twintaps or Nordic single tap Twintaps or Nordic single tap with PRO3 & CUBE with PRO7 & CUBE with COMBI+ & CUBE (page 12) (page 14) (page 16) Fusion with PRO3...
Page 12
13. Firmly push the elbow connector on the transparent 8. Place a new fibre washer on the tank connection and hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
Page 14
8. Place a new fibre washer on the tank connection and 13. Firmly push the elbow connector on the transparent hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
Page 16
13. Firmly push the elbow connector on the transparent 8. Place a new fibre washer on the tank connection and hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
Page 18
13. Firmly push the elbow connector on the transparent 8. Place a new fibre washer on the tank connection and hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
Page 20
13. Firmly push the elbow connector on the transparent 8. Place a new fibre washer on the tank connection and hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
Page 22
13. Firmly push the elbow connector on the transparent 8. Place a new fibre washer on the tank connection and hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
Page 24
13. Firmly push the elbow connector on the transparent 8. Place a new fibre washer on the tank connection and hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
Page 26
13. Firmly push the elbow connector on the transparent 8. Place a new fibre washer on the tank connection and hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
Page 28
13. Firmly push the elbow connector on the transparent 8. Place a new fibre washer on the tank connection and hose into the CO ₂ inlet on the back of the CUBE (‘CO ₂ ’). install the T-joint with spanner 12 and 14.
4 The CUBE starts up Three checks are now performed on the installation. During The CUBE then goes through a programme of four steps. these checks, click on the right arrow when you have During this programme, check the display regularly to make completed and checked the installation as described in sure that the CUBE is not issuing any messages.
If you have replaced one of the two, go to this topic on the display and click on CO ₂ or filter. The CUBE will then ask you whether you have replaced the cylinder or filter. After your approval, the counter restarts.
(in case of service) 1 Switch off the CUBE 3 Shut down the CUBE Switch off the CUBE using the display. Do not remove the Close the shut-off valve by turning the red knob. Verify power cable. that the system has been depressurised by activating the chilled water (push-wait-turn).
Page 33
Remove the blue communication cable from the top of Reconnect the boiling water hose to the Quooker tank (with the CUBE and remove the plug from the power socket. a fibre washer in between) using spanner sizes 12 and 14.
Technical specifications Tank CUBE Capacity 100 W / 220 - 240 V / 50 Hz Filtered water capacity* 2.4 litre/min Sparkling water capacity* 2 litre/min Standby consumption* 5W/hour Cooling down time* 30 minutes (first time 40 minutes) Height 50 cm 15.3 cm (22.3 cm including CO ₂...
Page 36
Quooker Hong Kong Limited 10/F, YF Life Tower 33 Lockhart Road Wanchai Hong Kong +852 2386 6326 info@quooker.hk www.quooker.hk...
Need help?
Do you have a question about the CUBE and is the answer not in the manual?
Questions and answers