Electrical Connection - Quooker PRO3-VAQ E Installation Manual

Hide thumbs Also See for PRO3-VAQ E:
Table of Contents

Advertisement

E
Connecting tank with Nordic tap
1
• The Quooker tank is supplied with a UK 3 pin plug and requires a standard
• If the mains lead is damaged it should be replaced by the manufacturer, their
• The light ring on the boiling-water tap will light up to indicate when the
• The Q-shaped button on top of the tank is the on/off switch. Once the water
• Ensure that the tank has sufficient height clearance to avoid pinching the hose.
• Do not use any other washers or sealants than the ones supplied.
1
3
13 amp earthed socket.
agent or a qualified technician to prevent hazard.
water is being heated inside the tank. It will also light up when the tap is
being touched to indicate that it is a boiling-water tap.
is up to temperature the light on the tank will fade in and out.
2
14
4
1 Connecting tank
Place the tank in position and connect
the inlet hose to the inlet combination
with the large fibre washer supplied.
Connect the tap hose to the fitting at
the top of the tank using the small
washer and size 10 and 14 spanners.
2 Electrical
connection
Connect the boiling-water tap by plug-
ging the LED cable into the hole pro-
vided at the back of the tank cover.
Connect the tank to the socket. Switch
the socket on but not the tank yet.
3 Filling tank
Open the Nordic boiling-water tap
and the stop valve on the inlet combi-
nation. Check for leaks. Flush the tank
through until the water is clear. Black
water will flow out initially. This is
Norit carbon from the filter and com-
pletely harmless.
4 Switching on
tank
Switch on the tank. After the water
has heated up, the entire content of
the Quooker must be flushed out once
before use.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents