Equipment Checklist - Edge-Core ECS4810-12M Installation Manual

12-port gigabit ethernet switch
Hide thumbs Also See for ECS4810-12M:
Table of Contents

Advertisement

E
QUIPMENT
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
P
C
ACKAGE
ONTENTS
Gigabit Ethernet Switch (ECS4810-12M)
Four adhesive foot pads
Power Cord
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
Console cable (RJ-45 to DB-9)
This Installation Guide
Management Guide CD
O
R
PTIONAL
ACK
If you plan to rack-mount the switches, be sure to have the following
equipmentavailable:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)
C
HECKLIST
-M
E
OUNTING
QUIPMENT
C
HAPTER
– 33 –
| Installing the Switch
2

Equipment Checklist

Advertisement

Table of Contents
loading

Table of Contents