Mitsubishi Electric PLA-RP-BA Technical Data Manual page 48

Mitsubishi electric split-type, heat pump air conditioners
Hide thumbs Also See for PLA-RP-BA:
Table of Contents

Advertisement

OUTDOOR UNIT
PUHZ-RP35VHA2
PUHZ-RP50VHA2
Air intake
[33 drain hole
45.4
4-10 o 21 oval hole
(M10 foundation bolt)
18
Handle for
moving
150
287.5
Free space around the outdoor unit
(basic example)
100 mm or more as long as
no obstacle is placed on the
rear and light-and-left sides
of the unit.
w 1
w 2
2 sides should be open in
the right, left and rear side.
Minimum installation space for outdoor unit
w 1. In the place where short cycle tends to occur, cooling and heating
capacity and power consumption might get lowered by 10%. Air outlet
guide (optional PAC-SG58SG) will help them improve.
w 2. If air discharges to the wall, the surface might get stained.
PUHZ-RP35VHA3
PUHZ-RP50VHA3
400
[33 drain hole
347.5
Air intake
Air discharge
Installation bolt pitch: 500
800
w 1
23
40
69
Service port
1. FOUNDATION BOLTS
Please secure the unit firmly
with 4 foundation (M10) bolts.
(Bolts, washer and nut must
be purchased locally.)
<Foundation bolt height>
FOUNDATION
w The position and the size of conduit hole
w Conduit hole
48
Service panel
Service panel
for charge plug
Connection for
liquid pipe
Connection for
gas pipe
183
2. PIPING-WIRING DIRECTION
Piping and wiring connection can
be made from the rear direction only.
3. ATTACHING THE CONDUIT
In order to attach the conduit, it is
necessary to fix the metal plate with
2 screws to the back panel. Procure
the metal plate and make screw holes
locally. It is recommended to use the
metal plate shown below. Align the
metal plate to the marks on the unit
and attach it.
depend on the conduit to be used.
Holes for metal plate fixing screw
w The size of hole depends on the screw to be used.
Unit : mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents