Preparation And Setup; General Filling Procedures - Aqua Lung SEA MK User Manual

Survival egress air (sea)
Hide thumbs Also See for SEA MK:
Table of Contents

Advertisement

6
SEA USER'S MANUAL
Component Identification
SCUBA Fill
Adapter
MK Second Stage

preparation and Setup

The purpose of this manual is to familiarize you with the correct setup,
filling, inspection and maintenance of the SEA.
The SEA is packaged fully assembled and ready to use after it has been
filled with air. Before using it, however, it is very important to carefully read
and understand the procedures outlined in this manual for filling the unit
and performing a preflight inspection.

General Filling procedures

NOTE: The average duration of air supply listed on page 25
of this manual is based on a completely full SEA cylinder, filled
to 3,000 PSI / 206 BAR with a volume of 2.0 cubic ft / 42.5
liters of air. It is strongly recommended that the SEA be filled
to 3,000 PSI / 206 BAR (cold fill), in order to provide maximum
breath volume.
1. Before attempting to fill the SEA, ensure that the fill adapter and
first stage are completely dry – especially in the area surrounding
the high pressure port.
LV2 Second Stage
First Stage w/
Integrated Valve
Cylinder

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sea lv2

Table of Contents