Electrical Connection; Y-Plan Connection - Atag A200SOV Instructions For Use And Installation

Open vent heat only boiler
Hide thumbs Also See for A200SOV:
Table of Contents

Advertisement

7

Electrical connection

7.1 Y-plan connection

connection terminal
18
The appliance complies with the CE Machinery Directive 89/392/EEC. The EC Low Voltage
Directive 72/23/EEC and the EC EMC Directive 89/336/EEC.
-
A 230V -50Hz mains electrical supply is required fused externally at 5A.
-
A deviation on the grid of 230V (+10% or -15%) and 50Hz
The installation must continue to comply with:
United Kingdom:
- the IEE Electrical Regulations.
Ireland:
- the ECTI national rules for electrical installations
The appliance must be connected to an earthed socket. This must be visible and within reach.
The following general stipulations also apply:
-
No changes may be made to the wiring of the appliance;
-
All connections should be designed in accordance with the enclosed regulations.
The boiler terminal X21 is for connecting the 230Volt external controls. Terminal X21 is
situated apart from and behind the control unit on the hing bracket.
Connect the 230V switched live to terminal X21. Note the polarity!
Connect the pump switch cable to terminal X21 according to the electrical diagram.
Lead the cables from the controls along the the hing bracket and through the cable feed
through in the back part of the boiler.
For more detailed questions about components that have not been supplied by ATAG,
contact the vendor concerned.
Terminal Block A200SOV
ATAG Z = not applicable
On/off = not applicable
n.a. = not applicable
External safety contact
DHW = not applicable
n.a. = not applicable
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
SL
N
L
8G.44.50.00
Figure 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

41-310-15

Table of Contents