Attention:
To avoid a tipping hazard, make sure that the frame casters do not
roll into the cable opening.
11. Turn the leveling foot of the plate assembly down until it contacts the bushing, and
then level the rack using the four leveling feet by tightening the lock nuts.
12. Lock the leveling feet by tightening the lock nut.
13. Insert the threaded rod into the inner hole of the leveler and the rubber bushing.
14. Thread down the threaded rod until the tip of the rod is approximately 1 inch inside
the turnbuckle.
15. Insert the nuts and hand-tighten the nuts.
16. Repeat the previous three steps so that all assemblies are completely installed, as
shown in the previous illustration.
17. Tighten all the nuts to 40 ft-pounds.
The frame is now secured.
Appendix D. Securing the Rack