IBM eserver pSeries 690 Installation Manual page 125

Hide thumbs Also See for eserver pSeries 690:
Table of Contents

Advertisement

4) Pull the BPF straight out of the BPE.
5) Repeat for the other BPF. There are two BPFs, one in front and one in back.
e. Remove any front and rear bulk power fillers.
5. To reduce the weight to the maximum two-person limit, do the following:
4
3
1 Front and Rear Rack Top
Frame Top Panels
2 Rack Top Frame
3 Left and Right BPE Rails
2
4
5
Appendix J. Removing and Installing the Rack Top Frame
Foam and Metal Air Baffle
Rack Top Frame Cross Brace
109

Advertisement

Table of Contents
loading

Table of Contents