Majestic Vemont Castings RHE25 Installation Instructions & Homeowner's Manual page 23

Natural vent insert
Table of Contents

Advertisement

5. Remove the two screws that hold the top brass trim.
6. Install the two brackets to the studs in the bottom of
the top channel. Use the nuts supplied with top trim
channel.
A flat louvre kit OR a bay window kit need
to be chosen to complete the installation.
RHE25SSP & HE25LP Replacement Parts
6
4
Vermont Castings, Majestic Products reserves the right to make
changes in design, materials, specifications, prices and discontinue
colors and products at any time, without notice.
IMPORTANT: Only trim panel assemblies approved
by Vermont Castings, Majestic Products can be
used on these products.
ALL repair parts will be available from your local dealer.
When ordering, always give the following information:
Model and serial number, part description with finish
and part number.
Key
Description
1
Trim Frame Black
2
Trim Top Deflector
3
Trim Top Channel
(1)
4
Trim Side Channel
5
Trim Top Channel
6
Trim Side Channel
7
Fasteners Package
(Not Shown)
(1) LP trim to be used with SSP trim.
SSP trim dimensions are for openings smaller than 26¹⁄₂" H x 38" W
(673mm x 965mm).
LP trim dimensions are for openings smaller than 29" H x 41" W
(736mm x 1040mm).
A2 HE25FP Trim
For use with RHEDV25
HE25FP
Flat face louvres with polished window
brass trim
10000836
Vermont Castings, Majestic Products RHE Natural Vent Insert
5
4
3
1
2
FP1289
FP1289
RHE
trim parts
2/03
RHE25SSP
HE25LP
(1)
10001939
-
55099
-
55077
-
55096
-
-
55097
-
55080
54618
57633
1. Remove the front glass (see "Glass Frame Removal"
section).
2. Install top and bottom brass trim by using the short-
est black screw. (Fig. 28 & 29)
3. Install bottom decorative plate by simply sliding it
under the unit floor. No fastening is required for this
installation. (Fig. 30) Be sure to remove protective
cover.
4. Install the bottom louvre assembly by fastening the
hinges with four screws to the pre-punched holes in
6
the cabinet.
5. Re-install the front glass.
6. Install the top louvre by using the hooks to hang it in
place.
Fig. 28 Install top and bottom brass trim.
NOTE: Position
brass trim top as
shown (small end
up) to prevent heat
discoloration.
Glass Frame
Fig. 29 Position brass trim to with small end up.
Bottom
Decorative
Plate
Fig. 30 Slide bottom decorative plate under unit floor.
Trim Assembly
Trim Top
Glass Frame
Trim Bottom
FP1290
RHEDV
frame mounting
Louvre
glass
2/03
FP1291
RHEDV
glass trim top
2/03
FP1292
bottom channel
2/03
Screws
FP1290
FP1291
FP1292
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vemont castings rhe32Vemont castings rhe42

Table of Contents